Core Value Proposition
In Class 100 cleanroom environments, partition walls between general areas must still meet stringent cleanliness requirements. This article provides an in-depth analysis of innovative partition wall designs that deliver optimal cost-effectiveness while ensuring performance through modular structures, economical sealing solutions, and smart monitoring technologies.
I. Cost-Effective Wall System Design
1.1 Economical Composite Wall Panels
Layer | Material Solution | Performance Parameters |
Surface Layer | 0.8mm pre-coated Aluzinc sheet | Corrosion resistance grade A4 |
Core Layer | 40mm rockwool fire-resistant core | Fire rating A1, sound insulation 35dB |
Backing Layer | 0.6mm antibacterial-coated steel | Surface resistance 10⁶-10⁸Ω |
1.2 Lightweight Framework System
Main studs: 60×30×1.5mm galvanized steel square tubes
Cross braces: 40×20×1.2mm C-shaped steel studs
Connection joints: Patented quick-release buckle system
II. Key Technological Innovations
2.1 Economical Sealing Solutions
Basic seal: EPDM composite gasket (100,000 open/close cycles durability)
Secondary seal: Single-component silicone sealant (2h curing time)
Airtight compensation: Adjustable pressure balance valves
2.2 Smart Monitoring Interface
Basic sensor package:
Differential pressure monitoring (±5Pa accuracy)
Temperature/humidity monitoring
Access status indication
III. High-Efficiency Construction Solutions
3.1 Standardized Installation Process
Laser floor positioning (±1mm accuracy)
Modular framework assembly
Snap-on wall panel installation
Rapid sealing system application
3.2 Quality Control Points
Joint flatness ≤1mm/2m
Airtightness ≤0.1%@100Pa
Surface cleanliness ≤1000 particles/m³ (≥0.5μm)
IV. Operation and Maintenance Management
4.1 Cost-Effective Maintenance Plan
Quarterly gasket inspections
Annual airtightness testing
Triennial anti-corrosion coating maintenance
4.2 Upgrade Options
IoT monitoring system
Self-cleaning coatings
Emergency pressure compensation devices
Project Application Examples
This system has been successfully implemented in:
Large pharmaceutical factory storage area partition
Transition area of electronic factory building
Laboratory auxiliary functional area